Home and How To

This Old House

This Old House, with trusted experts Tom Silva, Richard Trethewey, Jenn Nawada, and host Kevin O'Connor, is TV's original home-improvement show, following one whole-house renovation over several episodes.

E2 | Concord Country Cape | Saving What We Can

23m 42s

Concord, MA is famous for the start of the Revolutionary war, but also for its literary celebrities. Appliances, building material, and radiators are salvaged from the house before the major demolition begins. Outside, an arborist sprays the old Hemlock trees on the property to protect them from an insect called Wooly Adelgid. Time to cut off the garage addition.

Episodes

  • E2 | Concord Country Cape | Saving What We Can: asset-mezzanine-16x9

    E2 | Concord Country Cape | Saving What We Can

    S43 E2 - 23m 42s

    Concord, MA is famous for the start of the Revolutionary war, but also for its literary celebrities. Appliances, building material, and radiators are salvaged from the house before the major demolition begins. Outside, an arborist sprays the old Hemlock trees on the property to protect them from an insect called Wooly Adelgid. Time to cut off the garage addition.

Schedule

  • Image
    This Old House: Lexington: Drop in the Gutter: TVSS: Iconic

    This Old House

    Lexington: Drop in the Gutter

    Monday
    Jan 1

    30 Minutes

    A walking tour of the roof reveals its various pitches; installing a built-in gutter system; rough-in begins on the interior; energy-efficient windows are installed.
  • Image
    This Old House: Lexington: Drop in the Gutter: TVSS: Iconic

    This Old House

    Lexington: Drop in the Gutter

    Tuesday
    Jan 2

    30 Minutes

    A walking tour of the roof reveals its various pitches; installing a built-in gutter system; rough-in begins on the interior; energy-efficient windows are installed.
  • Image
    This Old House: The Westerly Project: Chimney Down and Walls Up: TVSS: Iconic

    This Old House

    The Westerly Project: Chimney Down and Walls Up

    Tuesday
    Jan 2

    30 Minutes

    Mark and Jeff take down the chimney; Scott and Shayla window shop; Jeff and Richard visit a convention to discover new plumbing products; back at the ranch, the exterior walls come down; Jeff reuses the original rafters for new wall framing.
  • Image
    This Old House: The Westerly Project: The Open Concept: TVSS: Iconic

    This Old House

    The Westerly Project: The Open Concept

    Wednesday
    Jan 3

    30 Minutes

    The crew places a center beam in the old ranch house to support the second story; a hole is cut in the original foundation for a new basement window; Kevin visits an engineered lumber factory in Canada; Tommy and Jeff raise the end gables.
  • Image
    This Old House: The Westerly Project: Raise a Second Story: TVSS: Iconic

    This Old House

    The Westerly Project: Raise a Second Story

    Thursday
    Jan 4

    30 Minutes

    The gambrel roof profiles are pre-assembled and raised; the crew stands up the second floor walls; three new apprentices from the Gen Next program learn how to measure and cut roof rafters; an engineer designs a septic system for the project.
  • Image
    This Old House: The Westerly Project: Decking for Beginners: TVSS: Iconic

    This Old House

    The Westerly Project: Decking for Beginners

    Friday
    Jan 5

    30 Minutes

    Tommy teaches the new apprentices to frame a deck; Jeff's crew frames the exterior flair detail; Jenn learns about Westerly granite; Jeff teaches the apprentices to install a window; Richard and Jeff look for a path for the drain stacks.
  • Image
    This Old House: Ipswich: Pre-Work: TVSS: Iconic

    This Old House

    Lexington: Phased Out

    Saturday
    Jan 6

    30 Minutes

    Work on the house is divided into phases for efficient workflow; the back foundation gets a stucco finish; kitchen cabinet selection; installing siding; the back patio gets proper drainage.
  • Image
    This Old House: Ipswich: Pre-Work: TVSS: Iconic

    This Old House

    Lexington: Phased Out

    Sunday
    Jan 7

    30 Minutes

    Work on the house is divided into phases for efficient workflow; the back foundation gets a stucco finish; kitchen cabinet selection; installing siding; the back patio gets proper drainage.
  • Image
    This Old House: The Westerly Project: Return to Paradise: TVSS: Iconic

    This Old House

    The Westerly Project: Return to Paradise

    Monday
    Jan 8

    30 Minutes

    Tommy and Jeff work on the main staircase at Jeff's shop and bring it to the house to install; at the Idea House, Kevin looks at new clapboard siding technology; Richard sees how a furnace is built and sees one being installed at the project house.
  • Image
    This Old House: Ipswich: Pre-Work: TVSS: Iconic

    This Old House

    Lexington: Phased Out

    Monday
    Jan 8

    30 Minutes

    Work on the house is divided into phases for efficient workflow; the back foundation gets a stucco finish; kitchen cabinet selection; installing siding; the back patio gets proper drainage.
  • Image
    This Old House: Ipswich: Pre-Work: TVSS: Iconic

    This Old House

    Lexington: Phased Out

    Tuesday
    Jan 9

    30 Minutes

    Work on the house is divided into phases for efficient workflow; the back foundation gets a stucco finish; kitchen cabinet selection; installing siding; the back patio gets proper drainage.
  • Image
    This Old House: The Westerly Project: The Doors: TVSS: Iconic

    This Old House

    The Westerly Project: The Doors

    Tuesday
    Jan 9

    30 Minutes

    Tommy and Jeff begin work on a coffered ceiling in the living room; local Westerly granite is cut to size for backyard steps; the complex septic system goes in; Kevin learns how the interior doors are built; Jeff installs one of those doors.
  • Image
    This Old House: The Westerly Project: Tanks for the Propane: TVSS: Iconic

    This Old House

    The Westerly Project: Tanks for the Propane

    Wednesday
    Jan 10

    30 Minutes

    The new propane tank gets buried in the backyard; Norm advises an apprentice in composite decking; Jeff and Tommy add final touches to the coffered ceiling; a shelving system goes into the new office; Mark applies a stone veneer to the new chimney.
  • Image
    This Old House: The Westerly Project: Rockin' the Granite: TVSS: Iconic

    This Old House

    The Westerly Project: Rockin' the Granite

    Thursday
    Jan 11

    30 Minutes

    Installing floating oak shelves and a mantel; Norm panels the playroom using the original knotty pine boards; Kevin visits the apprentices at a timber framing school, then he takes a tour of Westerly; Jenn uses Westerly granite for backyard steps.
  • Image
    This Old House: The Westerly Project: Pining for Old Pine: TVSS: Iconic

    This Old House

    The Westerly Project: Pining for Old Pine

    Friday
    Jan 12

    30 Minutes

    Norm uses old pine from a local sawmill to make a coffee table; Mauro teaches apprentice Kathryn to whitewash the knotty pine paneling; Tommy and Jeff build a pergola for the deck; Kevin helps with a shutter assembly; lighting the pergola.
  • Image
    This Old House: Ipswich: Pre-Work: TVSS: Iconic

    This Old House

    Lexington: Seven Layer Floors

    Saturday
    Jan 13

    30 Minutes

    The slab-on-grade foundation is built up; accessible AV solutions are explored; prep begins for a curbless shower; installing an automatic zero threshold door.
  • Image
    This Old House: Ipswich: Pre-Work: TVSS: Iconic

    This Old House

    Lexington: Seven Layer Floors

    Sunday
    Jan 14

    30 Minutes

    The slab-on-grade foundation is built up; accessible AV solutions are explored; prep begins for a curbless shower; installing an automatic zero threshold door.
  • Image
    This Old House: Ipswich: Pre-Work: TVSS: Iconic

    This Old House

    Lexington: Seven Layer Floors

    Monday
    Jan 15

    30 Minutes

    The slab-on-grade foundation is built up; accessible AV solutions are explored; prep begins for a curbless shower; installing an automatic zero threshold door.
  • Image
    This Old House: Ipswich: Pre-Work: TVSS: Iconic

    This Old House

    Lexington: Seven Layer Floors

    Tuesday
    Jan 16

    30 Minutes

    The slab-on-grade foundation is built up; accessible AV solutions are explored; prep begins for a curbless shower; installing an automatic zero threshold door.
  • Image
    This Old House: The Westerly Project: Seaside Transformation: TVSS: Iconic

    This Old House

    The Westerly Project: Seaside Transformation

    Tuesday
    Jan 16

    30 Minutes

    Touring the completed Dutch Colonial; pine table; hydroseeding; flying the refurbished flags.

WETA Passport

Stream tens of thousands of hours of your PBS and local favorites with WETA Passport whenever and wherever you want. Catch up on a single episode or binge-watch full seasons before they air on TV.

Similar Shows